Total length DJ102I – 25,63 km length of concrete ditches/roads – 4,60 km cross bridges – 72 pieces (of which 30 in Brasov county) side roads – 26 pieces short term parking – 13 pcs accesses to properties – 45
The work includes: the rehabilitation, consolidation, modernisation and equipping of the historic building for conversion into a museum; the construction of a new building with a height of 2S+P+M+2E and a built-up area of 8,527.00 sq.m which will include a
The project is part of the infrastructure investment objective “Sustainable urban mobility corridor in “Emanuil Gojdu” Square Oradea – Phase I”
Project completed: May 2024 The link road between the Municipality of Oradea and the Commune of Sânmartin is 5.75 km long, with a 2.27 km long link road to the DN76 and the locality of Haieu, and a 3 metre
Construction of new building and rehabilitation of existing hospital.
5,300 spectators for sports competitions; 7,200 spectators for other events; main hall for sports competitions; training hall – with a playing surface made of solid beech parquet that can be dismantled for events; 6mm pixelpitch multimedia cube; 2 pixelpitch 10mm
The water park will cover 2.8 ha, will have an area of over 10,000 square meters. The outdoor capacity of the aquapark will be 1,500 people and the indoor capacity of 300 people.
project includes the construction of a new passenger terminal with a constructed area of 12,791sqm, a new car park serving the entire airport, access roads, levelled runway apron surface, safety area, technology roads, taxiways, security control equipment and systems, as
Expansion, modernization and recompartmentalization of the Neurovascular Pathology and Neurosurgery Center of the Emergency Clinical County Hospital Cluj-Napoca; The medical centre will have a total of 90 beds; Duration of design and execution: 24 months.