Pucioasa Hospital
Construction of new building and rehabilitation of existing hospital.
Construction of new building and rehabilitation of existing hospital.
The plant has a treatment capacity of 6405 L.E., benefiting from advanced mechanical and biological processes. The plant is capable of removing both organic loads and nitrogen and phosphorus compounds. The project also includes a solar sludge drying unit, which
The water park will cover 2.8 ha, will have an area of over 10,000 square meters. The outdoor capacity of the aquapark will be 1,500 people and the indoor capacity of 300 people.
project includes the construction of a new passenger terminal with a constructed area of 12,791sqm, a new car park serving the entire airport, access roads, levelled runway apron surface, safety area, technology roads, taxiways, security control equipment and systems, as
Expansion, modernization and recompartmentalization of the Neurovascular Pathology and Neurosurgery Center of the Emergency Clinical County Hospital Cluj-Napoca; The medical centre will have a total of 90 beds; Duration of design and execution: 24 months.
The new building, designed to provide optimal conditions for mothers and newborns, is the first unit of its kind opened in Timisoara in the last 50 years. With a usable area of 5.400sqm and 126 beds, the maternity unit includes,
the project includes the structural consolidation of the entire building, restoration of the roof and replacement of degraded wooden elements, restoration of facades, restoration of historic decorations, removal of moisture and infiltration, installation of an architectural lighting system and enhancement
the total length of the route to be mordenized on the Progresu-Berceni segment: 7.8km.
15.000sqm of construction 5 buildings 459 apartments 6 office spaces