Nifon Palace
full consolidation and restoration of a historic monument building located on Calea Victoriei.
Rainwater drainage system – Magurele
Sinaia wastewater treatment plants
the station will be able to carry out biological wastewater treatment (a total volume of 13,500 m3) and will serve up to 34,150 people in the urban area of Sinaia, consisting of the localities: Sinaia, Poiana Tapului, Busteni and Azuga.
Pastoral Center of Caraiman Monastery – Busteni
Steaua Bucharest Stadium
31,254 seats 82.000sqm of constructed floor area 31,254 spectator seats 574 parking spaces 45.000mc of concrete 4.700t of reinforcement 2.500t roof structure 8.900sqm of natural reinforced synthetic turf 107.86 km of dedicated installation cables
Residential complex and offices Vitan
Emergency County Hospital “Dr. Pompei Samarian” Calarasi
Expansion with a new building and rehabilitation of the existing hospital.
Theoretical High School “Carol I” – School campus – Fetești
Teaching activities building: ground + 2 floors Building with accomodations for students: ground + 1st floor Gym, outdoor sports grounds Contract value: 5.495.463 euro Execution duration: 21 months Year of completion: 2016
Thermal insulation of blocks of flats – Bucharest
Contract value: 113.269.943 euro Number of blocks: 256 Technical data of the work: thermal insulation of buildings and replacement of windows Execution duration: 36 months