Steaua Bucharest Stadium
31,254 seats 82.000sqm of constructed floor area 31,254 spectator seats 574 parking spaces 45.000mc of concrete 4.700t of reinforcement 2.500t roof structure 8.900sqm of natural reinforced synthetic turf 107.86 km of dedicated installation cables
Residential complex and offices Vitan
Emergency County Hospital “Dr. Pompei Samarian” Calarasi
Expansion with a new building and rehabilitation of the existing hospital.
Theoretical High School “Carol I” – School campus – Fetești
Teaching activities building: ground + 2 floors Building with accomodations for students: ground + 1st floor Gym, outdoor sports grounds Contract value: 5.495.463 euro Execution duration: 21 months Year of completion: 2016
Thermal insulation of blocks of flats – Bucharest
Contract value: 113.269.943 euro Number of blocks: 256 Technical data of the work: thermal insulation of buildings and replacement of windows Execution duration: 36 months
Popa Nan 185 Residential complex – Bucharest
Contract value: 3.221.348 euro 2 underground floors+ Ground floor + 11 floors Built area: 663 sqm Total developed built area: 7.913 sqm Underground and above ground parcking: 54 seats Execution duration: 20 months
The olympic swimming and polo pool of the Dinamo Sports Club Bucharest
Contract value: 9.700.000 euro Olympic pool size: 50 m x 25m; depth: 2,10m; Heating pool: 25m x 10m 726 seats on VIP seats and lodges; locker rooms, kitchen, sauna, doping control service,gym, recovery club, conference room; computerized water supply,filtration and
“Gheorghe Dima” National Music Academy
Ploiesti Hippodrome
Contract value: 13.972.272 euro 3 acces roads 219 parking spaces 387 spectators in 2 grandstands trot track with an area of 36.594 sqm salivarium stables and horse boxes ancillary acillary constructions construcții anexe Execution duration: 24 months Year of completion: