“Tudor Arghezi” Metro Stadion

Bucharest
  • The station is an above ground station, consisting of a building (15,100 sq.m built area) with basement, ground floor and two floors. At the same time, six pedestrian access areas are being built (two of which are located on the opposite side of the Berceni road and connected to the new station by a pedestrian underpass).
  • The project will be completed in December 2022.
Next project